Quality assurance system is being followed in
both the units and Total Quality Management is being introduced
to steamline all the procedures and practices to achieve high
degree of efficiency in the operations. Constan efforts
are made for the improvement of materials, technology and eqiupment.
Development of manpower is being given special attention.
Required inspection process are extensive and
include visual and dimensional inspection, pressure test,
verification of chemical composition, radiography
and destructive tests for confirmation of specified
safety factors of stem nut-stem-wedge connection at axial load.